KNOWLEDGE CENTER
Knowledge Center
A Model for Change
Robust Engineering and Detailed Planning Prove Vital to Redesigned Car Model Launch
Challenge
A more-than-decade-old U.S. automotive OEM customer of Comprehensive Logistics (CLI) was preparing to launch the production of a completely redesigned car model. CLI had to transform a 640,000-sq.-ft. facility within a five-week time frame and resume manufacturing-support operations to meet the OEM’s new model production requirements.
Download the case study to see our solution and results.